Bamboo is not a water resistant product so if you aren t able to clean up the accidents right away you could get moisture damage.
Installing floating bamboo flooring over concrete.
Installing a hardwood floor over a concrete slab even if your home was built on a concrete slab you can still enjoy the beauty and charm of hardwood floors.
If you ve got concrete stairs to cover the laminate must be glued down using high quality construction glue.
Floating the planks under something heavy could damage the planks.
Padding can be used with most floating laminate floor installation.
If installing glueless click bamboo on concrete the concrete should be fully cured 30 60 days before beginning preparation for flooring.
Installing laminate flooring on concrete steps.
Armstrong flooring recommends the maximum moisture vapor emission for floating vinyl floors to be no more than 5 pounds per 1 000 square feet over a 24 hour period.
A floating installation is not secure enough for stairs and flooring coming loose might lead to falls.
You may also want to look at other options if your poodle has quite a few accidents.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
If you have a concrete subfloor you will need to go with a strand woven floating bamboo floor.
A floating bamboo floor shouldn t be floated under heavy objects such as pianos heavy appliances or weighty furniture as they will pin down the planks and affect the bamboo s ability to expand contract as humidity levels change.
For glue together and glue down floors it s between 8 and 12 pounds so be sure to check the moisture requirements for the product you purchase.
Installing floating bamboo flooring in your home is a fairly simple process which can easily be done by yourself traditional wooden floors tend to wear out over time but bamboo floors on the other hand are extremely durable as well as environmentally friendly.
For both wood and concrete subfloors the radiant heat should be turned on for approximately one week to ensure excess moisture is removed.